on 01-27-2015 3:27 AM
Hello All,
My SAP and DB are running on the same host. And its an SCM 5.0 system.
I observed that the idle time is always 100% for the optimizer.
Can anyone please elaborate the role of this optmizer and why the idle time is always 100.
for my SCM system, the CPU utlization keeps varying which is normal, but i dont get the role of optmizer.
Please let me know.
BR
Prashanth chikbala
Hello,
Optimizer is used for certain planning methods, including SNP optimizer, Capacity leveling optimizer, deployment optimizer, PPDS optimizer, CTM etc. If you do not use any of the planning methods, optimizer will not be used.
Best Regards,
Ada
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks a lot for the reply Ada,
We can see in our production system that in tcode /n/sapapo/opt09, there are 2 optimization servers maintained.
DPS02
SNP02
Which i pressume is being used for demand planning and SNP planning methods ?
In other words, how can we check if any of the planning methods are being used at all in our SCM 5.0 production system ? Please clarify. Iam a newbee in SCM and APO.
Hi,
They're for PPDS and SNP. There's no optimizer method in Demand Planning (DP).
However it's strange that you only have two optimizer servers. If you install the optimizer engine correctly, and configured SM59 correctly, I think you should see all of them, no matter you will use them or not ...
Whether or not optimizer is used is decided by your business. If any planning with optimizer has been executed, you should be able to see a log in /sapapo/opt11 (of course unless you or system deleted them).
Best Regards,
Ada
Thanks a lot again for the reply.
I have checked in /sapapo/opt11 and I am able to see only SNP related logs however the status are in yellow and when I click the log buttun it throws a pop with a message that "no log exist".
And in SM59, under TCP/IP i can see 4 rfc connections (OPTSERVER_SNP01, OPTSERVER_SNP02, OPTSERVER_DPS01, OPTSERVER_DPS02) and for all these connection test is working successfully.
So from this can I canclude that the planning method are not being used and for that reason CPU Utilization is 0%?
Best Regads,
Prashanth Chikbala
User | Count |
---|---|
11 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.