on 01-29-2015 7:11 AM
Dears
When I analyze certain POs already posted in our system, it is seen that some POs are created with Account Assignment Category 'K' which is posting expenses to Cost Centre. Also in the same PO, Material Code is also entered which has a valuation class and GL account configured.
I hope the GL postings will have the preference from Acc Assignment Category used in PO i.e. 'K'.
Then what is the additional benefit if we put the Material Code also in the PO ?
Hi nikki
First of all what purpose this PO is created...is it mat procurement or service PO ?
1. If mat procurement then mat code should be there...
2.If it is service PO...may or may not materials because some service PO includes materials also.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Nikki,
It will post to expense while you do GR. But the GR/IR account will be created based on material valuation class. If you have not maintained any material code, then it will hit GR/IR account which was maintained in OBYC for blank valuation class.
Regards,
Mukthar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi nikki
You right...in service PO no question of GR because you are not asking for material to be supplied..it is service to be supplied..hence directly it will post to exp a/c linked to CCtr as assignment.
Sometimes we ask for services along with material also in our service contract putting a separate line item as material but whole cost will post as a service cost expense a/c
As you said, the GL picked from blank valuation class, for all those POs with account assignment category 'K', the system selects the OBYC entry in GB B-VBR having blank valuation class and post to the GL. (Of course we do not have a valuation class as the PO is not related to a material or service code !). Right ?
Hi nikki
Example
Service PO for calibration of weighing machine
item 01 Calibration charge 100
item 02 Small spare 0001 10
Total Service PO value 110
Now when we enter the service sheet for raising invoice..we raise against 110 and will post to Exp a/c and also debit to CCtr
You will get detail report and analysis for future planning also and by including small items in your service PO can avoid stock carrying cost of that items. Si it's always better to define materials if it finds reasonable for future control otherwise no need
Hi Saju,
I think there is no extra benefits,only you can search PO with reference to Material code through standard report like ME2N, ME2M, ME2L etc.
Thanks,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.