cancel
Showing results for 
Search instead for 
Did you mean: 

Master data load into PCM from BPC using FIM

Former Member
0 Kudos

Hello,

We have requirement to load PCM from BPC model using FIM and along with measure data, master data has to be loaded into PCM in case corresponding master data is not available in PCM. For master data, hierarchy structure has also to be maintained in the load. Is it possible in FIM?

Thanks a lot in advance!

Regards,

Rajesh

Accepted Solutions (1)

Accepted Solutions (1)

0 Kudos

Hello Rajesh,

FIM does not provide option for master data import. You can only import the transactional data into the target system.

Best regards,

Khawla

Answers (0)