on 01-29-2015 11:50 AM
Hello,
We have requirement to load PCM from BPC model using FIM and along with measure data, master data has to be loaded into PCM in case corresponding master data is not available in PCM. For master data, hierarchy structure has also to be maintained in the load. Is it possible in FIM?
Thanks a lot in advance!
Regards,
Rajesh
Hello Rajesh,
FIM does not provide option for master data import. You can only import the transactional data into the target system.
Best regards,
Khawla