on 02-10-2015 10:57 AM
Hello *, I have marked condition type ZPR0 for manual maintenance in pricing procedure. Additional "C - Manual has priority" was choosen for condition type. But the system automatically determines a condition record. How to avoid this behaviour? We explicitly need manual maintenance for this process. Thanks a lot. Kind regards Thomas
Hello Thomas,
Here I suggest you have to rethink on the solution you have.
If you are expecting only manual entry for a condition type , then then there is not need of attaching the condition records for that. You can remove access sequence from the condition type.
Manual entry - C means, the manual entry has priority. If there is a condition record found the system will populate condition value, if the use modify that manually that value get replaced.
Thanks and Regards
Shanto Aloor
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Thomas ,
The option you have chosen just does this : It makes sure that manual entry could be overwritten. Hence I believe the functionality is working fine.
~kavindra
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
We raised an OSS call as it seems to be a bug. The condition record is required for other processes and cannot be deleted.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Thomas,
I presume as there is a condition record the system retrieves the price. The solution would be to delete the condition record.
Best regards - Christophe
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
4 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.