on 02-26-2015 10:03 AM
Hi experts,
I have two jobs set in the following sequence:
Job1: RV60SBAT (create billing document) Billing document has output (IDoc) with medium 4 (send immediately)
Job2: RSEOUT00 This job is set to start as soon as job1 completed.
Issue below happened:
Some IDocs created from job1 were not selected by job2.
Until now issue is not reproduciable.
I wish to know is it possible that even Job1 (RV60SBAT) completed(=SM37 shows finished) the database update of Idocs or
lock on Idocs were not finished? In orther words, when job2 (RSEOUT00) starts, some Idocs created from billing documents of
Job1 were not updated/released completely?
Thanks.
You may need to provide a gap (say for example 5 minutes) between job1 and job 2 run time and can try. Also take a look at OSS Note 1862248 - Delays sending outbound Idocs (status 30) which have been configured to transfer immediate...which may help to resolve your issue.
Regards,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Shiva,
Thanks for your suggestion.
May I know how to set a gap between job1 and Job2?
At SM36 "start condition" I could only find 6 options (Immediatly, Date/time; after job; After event; after opreation mode; workday/time)
It is not possible to know how long will job1 run, so I could not set an exact start time for Job2.
PS: In partner profile, the seting is "collect Idoc". not transfer immediately.
Thanks.