Hi Gurus

My client is using PP-PI and have only one resource.

In prod. versions always two operations are maintained paralelly eg.: 0010 and 0020 (use the same resource)

0020 phase contains the fix and variable proc time.

When a plan order is generated of course two operations exists

My client during detailed production planning doesn't want to see in CM21 the two phases for one order. How can I remove operation 0010 or 0020 from screen in CM21? Shall I modify the sorting?

Thanks for your help

Accepted Solutions (1)

Accepted Solutions (1)

Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello

If you don't want to see one of the operations on capacity leveling, make sure that you are using a control key that does not generate capacity requirements.

In addition, since you are working with process orders you should use the standard overall profile, "SAPPI_G001" on CM25 or transaction CM29.

Regards

Caetano

Former Member
0 Kudos

Hi Caetano

Yep You're right I missed to change control key... For CM25 I already did Z* profile but thanks for the answer