I have 100 tonn press,which required preventive maintenance for 180,1000,5500,10000,100000 shots,
and user want to have only one maintenance plan in performance based.
How will handle this?
Regards,
Shri
Hello Shri,
You can achieve this in a single Strategy based plan using IP42.
First create a maintenance strategy using IP11 with maintenance packages for 180, 1000, 5500, 10000, 100000 shots. Now, create a task list and assign packages to the operations in Operations screen. Now create maintenance plan with IP42 for the strategy, Now, kick off the plan from start or in cycle using IP10 and then schedule it with IP30.
Thanks,
Venu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Shri,
In the Performance Strategy-based plan (IP42), you will will enter Strategy and equipment number. Then SAP determines the Counter (from Equipment master) for which readings are entered periodically. Then you need to enter the Strategy-based task list in the plan. In the task you have to define all the operations needed at 180, 1000 shots.
Please find herewith a pdf with detailed presentation on strategy-based plan: http://events.asug.com/2012AC/2602_Using_Maintenance_Strategy_Plans.pdf
Thanks,
Venu