cancel
Showing results for 
Search instead for 
Did you mean: 

Plan version Dilemma

0 Kudos

Hi,

We are implementing OM in development client.I have started with OM number ranges.But im stuck whether to take $$ as plan version or any other ( ex: 01)

What would be the best suitable one.

Thanks

Accepted Solutions (1)

Accepted Solutions (1)

venkateshorusu
Active Contributor
0 Kudos

Go through below information.

      1. Enter the subgroup for which you wish to set up number assignment.

  • The following entries are allowed (when number assignment is not valid for all plan versions).
  • $$$$ (plan version and object type are generic)
  • PV$$ (plan version, object type is generic)
  • PVOT (plan version, object type)

  • The following entry is not allowed:
  • $$OT (plan version generic, object type)

  • The following entries are allowed (when number assignment is valid for all plan versions):
  • $$$$ (plan version and object type are generic)
  • $$OT (plan version generic, object type)
  • The following entries are not allowed:
  • PVOT (plan version, object type)
  • PV$$ (plan version, object type is generic)

  • Save your entries. The systems automatically creates an external number range (EX) and an internal number range (IN).

  1. 2. Specify the subgroup on the following screen and choose "Change intervals".

  1. 3. A new data screen appears on which you can maintain number range intervals. Choose "Create interval".

  1. 4. Enter the code for the number assignment (IN or EX), the lower limit and the upper limit of the interval in the dialog box which then appears.
  • In the case of external number assignment, mark the field "ext" also.

  1. 5. Choose "Insert" and save your entries.

Regards

Venkatesh

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi Hardik,

The current plan version should be "01" and it shuould be set as in PLOGI PLOGI under the table T77S0.  This plan version represents your current organization.


$$$$ represents SAP Standard entry for the Number Range. First two $$ represent - the plan version and 2nd two represents the Object type. Go to T-code OONR and you can create new subgroup if you want.

Thanks'

Gautam