on 03-04-2015 9:38 AM
Dear Experts,
At my client side, Attendance quota infotype (2007) is getting generated through PT60, using the standard schema and standard Time Statement variant. During a particular period (09.02.2015 - 15.02.2015), whenever live run is done, and we press the escape key, number of hours is getting added up. It should remain the same. Can you let me know which table to check for the same in the log?
Regards,
Bhagyashree
You have to check P2007 TIP and TOP table from time schema
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
My issue is, there is a particular attendance quota, when remained unused, gets increased while running PT60 from the Standard Schema and Standard Time Statement Variant. I have checked in the step Automatic Accrual of Absence Quotas > Permit Generation of Quotas in Time Evaluation, No Generation is selected. Still the quota is getting generated. I want to stop this generation of Quota. Is there any other way through which I can do the same?
Regards,
Bhagyashree
Hi,
IT2007 can be generated by batch upload or manually and time evaluation doesn't create IT2007 it only helps in reducing the entitlement .
For e.g. pre approved OT hours created in IT2007 can be reduced by the OT processing in time evaluation .
Please re-check or place the screen shots for better understanding
With Regards
Aditya