Spit in supply quantity while doing ATP

former_member232086
Participant
0 Kudos

Team  thanks to help.

There is some error while doing ATP….  Scenario…there is one item with stock 1000 and a sales order is created in 01.01.2015 (a) with 1000 requested date was in 01.03.3015

And there one production order for 2000 for 01.04.2015 there is another sales order (b) with requested delivery date 03.03.2015 when am trying for ATP it showing fully available as on 03.03.2015 but when trying for outbound system blocking it and showing that “only 0 KAR of material available “

And in the sales order B there was no hint showing that the stock is taken from production order while doing ATP..

How to solve it..is there any report to check the combination of supply ..how much from ready stock and how much from Production order…even in co09 it is showing that full supply from stock

Thanks

Vijesh

Accepted Solutions (1)

Accepted Solutions (1)

Lakshmipathi
Active Contributor
0 Kudos
how much from ready stock and how much from Production order

There would be different movement types involved in the above process and hence, via MB51, you can track the origin.

G. Lakshmipathi

former_member232086
Participant
0 Kudos

Hi

it is difficult  for as there are 300 items  in one sales  order..it is creating confusion  while  going  for delivery. .may I know  why the system  is confirming  stock  from future  production  and the confirmation  date is still  current. ..

Tx

Vijesh

Answers (5)

Answers (5)

former_member232086
Participant
0 Kudos

any suggestions

Former Member
0 Kudos

Hi Vijesh,

can you show us the schedule lines dates in detail? Like below:

former_member232086
Participant
0 Kudos

Is there any table which splits the confirmed quantity..like how much from stock and how much from future orders?

phanikumar_v3
Active Contributor
0 Kudos

Dear Vijesh

check like below:

1.In Both the sales orders-is the plant is same??

2.If not-what was the Availability check maintained based on Distribution chain(Sales org+Dist Channel)

3.For this availability check--what was the checking groups assigned.

4.For these checking groups what are the controls at OVZ9.

5.Is the sales area in both sales orders is same/not--check with OVZJ with availability check rule.

Pl update us..

Phanikumar

former_member223981
Active Contributor
0 Kudos

Can you share the CO09 screenshot for checking rule "A" and checking rule "B"?

former_member232086
Participant
0 Kudos

please see the screenshots

former_member223981
Active Contributor
0 Kudos

Hi,

In screenshot 1, order 20029985 is confirmed against your stock. The production order is not providing the confirmed quantity here. The ATP check will always confirm a requirement against the nearest preceding receipt element. In this screenshot, there is no preceding receipt so it gets confirmed against the stock.

However, this order looks strange - you have schedule line 1 with a delivery date = 4th March & a confirmed quantity = 0. Then, you have schedule line 2 with a delivery date = 4th March & a confirmed quantity = 13140. There should be no need for a 2nd schedule line here and I think this could potentially be the cause of the 0 available quantity. Do you know how the situation of these 2 schedule lines arose? Does V_V2 remove the 2nd schedule line?

former_member232086
Participant
0 Kudos

Hi Noel,

even we dont know how the second schedule line is creating...may i know why is it creating  and what should we do to avoid this?

Former Member
0 Kudos

Hi Vijesh,

can you also show the scope of check for both the CO09 scenarios?

Regards

Enrico.

former_member232086
Participant
0 Kudos

HI,

Below the details of scope of check

former_member223981
Active Contributor
0 Kudos

Well to me it looks like it the 2nd schedule line should not be created! Maybe you can post the shipping dates of each schedule line for us to check to see the difference.

Former Member
0 Kudos

Judging from the two pictures above, I suppose it could be the case that, ATP checks in sales order includes production orders whilst in delivery it does not, and in addition, availability check gets rerun in processing outbound delivery (controlled by 'availCkOff' field in delivery item category), so please have a look with that regard

Former Member
0 Kudos

Hi Vijesh,

you should first check the atp check rule (OVZ9). Are you including replennishment lead time in the sales order control rule (checking rule A)?

In general you can't distinguish between available stock and theoretical (from production order/purchase order) in the ATP check. You can exclude the production order from the control or restrict to released production order.

Enrico.