cancel
Showing results for 
Search instead for 
Did you mean: 

Redwood Wait Events

Former Member
0 Kudos

Hi,

I have configure a job with 3 wait events as the conditio but currently the job is trigger if one of those wait event is raised but i need all the wait event to be raised then only the job should be trigger to run. Any thought on this?

Regards,

Chris

Accepted Solutions (0)

Answers (3)

Answers (3)

gmblom
Active Contributor
0 Kudos

Hello Chris,

Is your setup also possible with 1 event definition? In that sense, that all 3 raisers raise the same event instead of using 3 separate event definitions?

Regards Gerben

nanda_kumar21
Active Contributor
0 Kudos

Please provide a screenshot of your setup in waitevent tab.

Out of the three, set one event to auto-submit - "always", and for the rest of the two - set autosubmit to "Never"

thanks

Nanda

Former Member
0 Kudos

Hi Chris,

You may try building a "Job Chain" and put your wait events into the steps. Think about parallel structures if you want to wait until your 3 conditions apply. Let me send a screenshot, to make you better unterstand:

Best Regards,

Serhat

Former Member
0 Kudos

Hi Serhat,

Do you mind to explain in more detail set up your method using the job chain ? As i cannot see there is any tab/collumn to define the event in the steps inside the job chain as i only allow to define job definition inside the job chain. Looking forward for your advise.

Regards,

Chris