Hello All
I need some clarification on PSS.
I have already created the M-BOM by synch' of Product variant in PSM.
The Synch Unit has the status aligned and also M-BOM is created.
Now there are some changes made in the items of the assembly used in the product variants.
1. Can I now re-run the existing synch unit so that the changes are reflected in the M-BOM
or is that I need to create new synch unit for the changes to be reflected with alternative number for the same M-BOM.
Prompt reply will be highly appreciated as I need to resolve this issue ASAP.
Cheers
Satish
Hi,
Has the assembly below the product variant been synchronized?
If yes, then of course leveraging the existing sync unit is the standard behavior.
Ulf.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
110 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.