Hello All

I need some clarification on PSS.

I have already created the M-BOM by synch' of Product variant in PSM.

The Synch Unit has the status aligned and also M-BOM is created.

Now there are some changes made in the items of the assembly used in the product variants.

1. Can I now re-run the existing synch unit so that the changes are reflected in the M-BOM

or is that I need to create new synch unit for the changes to be reflected with alternative number for the same M-BOM.

Prompt reply will be highly appreciated as I need to resolve this issue ASAP.

Cheers

Satish

Accepted Solutions (0)

Answers (1)

Answers (1)

ulf_petzel
Advisor
Advisor
0 Kudos

Hi,

Has the assembly below the product variant been synchronized?

If yes, then of course leveraging the existing sync unit is the standard behavior.

Ulf.

former_member223190
Participant
0 Kudos

Yes,  it was synchroinzed before . Its working now