on 03-25-2015 2:25 PM
Hello All
We are using Engineering Change Number in DMS as object link while creating the DMS. Change Number validity date is for e.g. 01.01.2015.DMS is created with status IE i.e in preparation.
When DMS is reached to PA i.e approved status, system is automatically change the validity date as current system date & when DMS reached to RE i.e released status, system is showing this current date in front of the status RE.
So our requirement is when DMS is in RE status then only it should change the date from 01.01.2015 to current date. This is becuase after PA status there is gap of 15 to 20 days of release the document & we don't want to se the release date as of PA status.
How we can achive this?
Waiting for your reply.
Thanks
Pravin
Can anybody give me some idea on above mentioed issue?
Thanks
Pravin
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
88 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.