cancel
Showing results for 
Search instead for 
Did you mean: 

Sending more than one PO to Idoc PORDCH03

Former Member
0 Kudos

Hi All,

I am calling Idoc PORDCH03 into my Data Services and sending data to SAP through PORDCH03 Idoc.

With this Idoc, I am not able to send more than on PO at a time.

I am Passing PO to Segment E1PORDCH.

Do we have any other options to pass more than one PO .

Regards.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

You can, Why do you think we cannot pass multiple POs to PORDCH03?

-Chaitanya

Former Member
0 Kudos

Hi,

I am passing PO Number to Segment: E1PORDCH.

When I pass more than one PO, My BODS Job is throwing error that "Adding this Segment Exceeds maximum allowed number of repetitions"

But when I pass only one PO, Job is executing with out fail.

Regards.

Former Member
0 Kudos

Hi,

I have resolved this by changing Schemas as required.

Regards.

former_member200473
Contributor
0 Kudos

Hi Chaitanya,

would you please post the change as screenshot.

Regards,

Shiva Sahu

khanesh
Explorer
0 Kudos

Hi Shiva you got anything about this error like changing schema?

Answers (0)