on 04-14-2015 8:59 PM
I know in prior versions of SAP there is documentation that the serial number on an inspection lot cannot be changed after the lot has been recorded.
Does anyone know if this functionality has evolved to be more flexible in later releases? I want to change my serial number mid or at the end of my build, after I've done various installs and inspections. I use multi-pc orders so cancelling/closing/new orders are not a viable option.
THANK YOU
Hi!
These are the recent changes to Quality Inspection:
SAP ECC Integration - SAP Manufacturing Execution (SAP ME) - SAP Library
But I do not think your requirements have been met yet.
Regards,
Sergiy