How to store material in spite of open lot

Former Member
0 Kudos

Hi everybody, I havbe questiopn how to manage following scenario:

We have an open lot for initial sample testing.

Initial testing is delayed for let say 30 days. In this period there are further incoming shipments with same material from same vendor.

While we have this open lot storage of further incoming material is not possible and goods are blocking goods receipt area.

Is there a solution to store this goods in spite of open lot ?

Thanks fopr a good idea and Best Regards

Peter

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi Peter,

What is your exact requirement? What is the problem, you are facing now?

Whether you want to stop further goods receipts till the existing open inspection lots are cleared?

Kindly provide in detail

Regards,

Bala

former_member42743
Active Contributor
0 Kudos

You have the "Documentation Required" indicator on in the QM plant view of the material master.

Having that set prevents additional receipts until that lot is processed.

Try it in a sandbox and see if fixes the issue.  Unfortunately, by having it off, you also lose the other benefits of having it on.

Craig

arunsapqm
Participant
0 Kudos

Hi,

you should also check with QM consultant,we can restrict the same in QM procurement control key IMG settings & material master.

Thanks in advance

former_member42743
Active Contributor
0 Kudos

QM in procurement key only controls how soruce inspections are controlled.  Not regular 01 inspection lots.

Craig