cancel
Showing results for 
Search instead for 
Did you mean: 

Advanced Adapter Engine Restarting Job

former_member186158
Active Participant
0 Kudos

When schedule a restarting job with  SOA tool in NWA, A message of year 2013 triggered.

and make a  huge error: old dirty data was filled into the business system.

I think there is a queue, how to find it and remove it, to avoid this?

PI system is 7.31.

Thanks very much.

Accepted Solutions (1)

Accepted Solutions (1)

former_member184720
Active Contributor
0 Kudos

In rwb.(http:// host : port/rwb.

go to database overview, you have the filters to choose

Daily

weekly

monthly

Yearly

So choose 2013 year which should display the messages.

Yout should be able to open the failed messges. If you don'the need then cancel them from the same screen

former_member186158
Active Participant
0 Kudos

Thanks

Answers (0)