While running an ERP EHP7 Upgrade, in phase RUN_CRR_LAST Phase im unable to proceed.
First this phase failed since PXA was too small, so many tables cancelled, therefore I fixed this issue by increasing abap buffersize parameter and no more dumps were found
So, when I try to restart the SUM Process Im stuck in this phase
In the logs its states
1 ETQ359 RFC Login to: System="TEX", AsHost="ARBUE-V-SA03D" Nr="02", GwHost="ARBUE-V-SA03D", GwService="sapgw02"
2 ETQ232 RFC Login succeeded
4 ETQ010 Date & Time: 20150417150518
1 ETQ233 Calling function module "SUBST_CHECK_BATCHJOB" by RFC
2 ETQ373 parameter "JOBNAME" = "RSUPG_ISU_CRR"
2 ETQ373 parameter "JOBCOUNT" = "15051800"
2 ETQ373 parameter "IV_VERIFY" = " "
1 ETQ234 Call of function module "SUBST_CHECK_BATCHJOB" by RFC succeeded
4 ETQ010 Date & Time: 20150417150518
2 ETQ373 parameter "JOBSTATUS" = "F"
2 ETQ374 parameter "RC_CHECK" = "0"
2 ETQ373 parameter "JOBENDDATE" = "20150417"
2 ETQ373 parameter "JOBENDTIME" = "150518"
4 ETQ263 Batchjob "RSUPG_ISU_CRR" finished successfully
1 ETQ124 Scanned file 'log\RSCRRLST.TEX' from offset 17273 to 18454 for errors.
4 ETQ010 Date & Time: 20150417150519
1EETQ399 Last error code set is: Single errors (code <= 😎 found in logfile 'RSCRRLST.ELG'
1EETQ203 Upgrade phase "RUN_CRR_LAST" aborted with errors ("20150417150519")
Batchjob "RSUPG_ISU_CRR" finishes successfully, but some how it says it found an error in log RSCRRLST.ELG
RSCRRLST.ELG
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Final data transfer of change recording framework ERRORS and RETURN CODE in RSCRRLST.TEX
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
A4 ESUPG 002 " "
A4 ESUPG 001 -------------------------------------------------------------------------
A4 ESCRR_ISU 005 Action "LAST" started at "15:05:18"("17.04.2015")
A4 ESCRR_ISU 010 Number of used dialog processes set to "6"
A4 ESCRR_ISU 010 Number of used dialog processes set to "10"
A2EESCRR 097 Transition "LAST_TRANSFER" can not be started because transition "START_TRANSFER" failed
A2EESCRR 097 Transition "LAST_TRANSFER" can not be started because transition "START_TRANSFER" failed
And that log only says
Transition "LAST_TRANSFER" can not be started because transition "START_TRANSFER" failed
Im able to login to shadow instannce - Transaction CRR_CONTROL and its in yellow state, ready to be started.
If I started in manually, the upgrade says there is another so It has to be stopped. Then i restart the SUM process and it fails again
RSCRRLST.ELG
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Final data transfer of change recording framework ERRORS and RETURN CODE in RSCRRLST.TEX
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
A4 ESUPG 002 " "
A4 ESUPG 001 -------------------------------------------------------------------------
A4 ESCRR_ISU 005 Action "LAST" started at "15:05:18"("17.04.2015")
A4 ESCRR_ISU 010 Number of used dialog processes set to "6"
A4 ESCRR_ISU 010 Number of used dialog processes set to "10"
A2EESCRR 097 Transition "LAST_TRANSFER" can not be started because transition "START_TRANSFER" failed
A2EESCRR 097 Transition "LAST_TRANSFER" can not be started because transition "START_TRANSFER" failed
RSCRRLST.TEX
A4 ESUPG 002 " "
A4 ESUPG 301 Report name ...: "CL_CRR_BASE_SCENARIO -> CONSTRUCTOR"
A4 ESUPG 302 Log name .: "E:\SUM\abap\tmp\RSCRRLST.TEX"
A4 ESUPG 304 Start time.....: "17.04.2015" "15:05:18"
A4 ESUPG 002 " "
A4 ESUPG 001 -------------------------------------------------------------------------
A4 ESCRR_ISU 005 Action "LAST" started at "15:05:18"("17.04.2015")
A4 ESCRR_ISU 010 Number of used dialog processes set to "6"
A4 ESCRR_ISU 010 Number of used dialog processes set to "10"
A2EESCRR 097 Transition "LAST_TRANSFER" can not be started because transition "START_TRANSFER" failed
A2EESCRR 097 Transition "LAST_TRANSFER" can not be started because transition "START_TRANSFER" failed
A4 ESUPG 001 -------------------------------------------------------------------------
A4 ESUPG 002 " "
A4 ESUPG 301 Report name ...: "CL_CRR_BASE_SCENARIO -> CONSTRUCTOR"
A4 ESUPG 304 Start time.....: "17.04.2015" "15:05:18"
A4 ESUPG 305 End time ......: "17.04.2015" "15:05:18"
A4 ESUPG 002 " "
A4 ESUPG 001 -------------------------------------------------------------------------
4 EPU202XEND OF SECTION BEING ANALYZED END OF RUN_CRR_LAST =================================================
Any idea how to fix this?
Best
Martin
Same Problem Heree
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Anand,
I have open a Support ticket.
Checks after phase MAIN_SWITCH/SUBMOD_SWITCH_OLDREL/SUBMOD_CRR_LAST_CHTRANS/RUN_CRR_LAST were negative!
Last error code set: Single errors (code <= 😎 found in logfile 'RSCRRLST.ELG'
Batchjob RSUPG_ISU_CRR on shadow system failed.
Detected the following errors:
# K:\usr\sap\TD4\EHP7\SUM\abap\log\RSCRRLST.xx:
A4 ESUPG 302 Log name .: "K:\usr\sap\xx\EHP7\SUM\abap\tmp\RSCRRLST.xx"
A4 ESUPG 304 Start time.....: "23.04.2015" "09:34:54"
A4 ESUPG 002 " "
A4 ESUPG 001 -------------------------------------------------------------------------
A4 ESCRR_ISU 005 Action "LAST" started at "09:34:54"("23.04.2015")
A2EESCRR 097 Transition "LAST_TRANSFER" can not be started because transition "START_TRANSFER" failed
A2EESCRR 097 Transition "LAST_TRANSFER" can not be started because transition "START_TRANSFER" failed
I already restarted the Server, ABAP, DB and SUM.
I checked the table CRRERROR and it hast 200 entries one of them has for example the table T5SKT
when I check the table CRRTASKINFO on the field ADDCHAR1 with T5SKT. It has no error status. I think that the Error is there but I that SAP confirms this to me.
Regards
Jorge
Hello All,
We solved the problem ! The trick was step 4 ! Repeat the phase without init !
Dear Customer,
Could you please perform the following,
1. stop the transfer in CRR_CONTROL in shadow instance
2. restart the shadow instance
3. start the transfer in CRR_CONTROL in shadow instance
4. if it is green, stop the transfer
5. repeat the phase in SUM
This should solve the issue. Please let me know the outcome.
Upgrade to EHP7 742 release
Thanks guys for providing assistance
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Martin Simois,
Glad to know that the issue has been solved.Please close the thread.
Regards,
Anand.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
@Martin Simois check my post.
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi SS
That note was also helpful before entering Downtime, and a couple of tables were in Black Status and after restating I was able to move on
Sadly, this is no applicable to the situation Im experiencing now,
This same situation happened or another system being upgraded.
I proceeded to Start / Stop CRR Process and then I was able to restart SUM and continued to the next phase, but it does not seems to work on this system being upgraded
Its running an a SQL Server 2012 so it should not be a problem
In CRR_CONTROL, Im able to start process manually and there are six CRR process running in Background
My concern, should I wait until this job completes? Its been running for over 75.000 seconds and writing the CRR Logs in SUM Folder
If i Stop it, and the try to continue with SUM, it displays the message stated above
and if I dont stop it, SUM stated there is a duplicated Replication Process Running
Any idea how to troubleshoot this?
Best
Martin
User | Count |
---|---|