cancel
Showing results for 
Search instead for 
Did you mean: 

Material Status MM02 (How can I change to status 49 or 50)

Former Member
0 Kudos

Material Master MM02

Basic Data 1

I want to change the X-Material Status 40 (procces) to 49 (obsoleted) but I can´t, the system said "Material Status can´t be set: usage farther

How can I change this Status?

Thanks.

Accepted Solutions (1)

Accepted Solutions (1)

ulf_petzel
Advisor
Advisor
0 Kudos

Hi,

please check the recommendations you already got. Since the status you are referring to are customized specifically in your system, you might have done some tweaks in this area as well with regards to status transitions.

Ulf.

Answers (1)

Answers (1)

pardhreddyc
Active Contributor
0 Kudos

Dear,

Did you check the configuration parameters for "Material Status" under LOgistic general-->Matrerial master-->Define Materialstatuses

At this step check the message type.

Regards,

Pardhu

Former Member
0 Kudos

MM02

Basic Data 1

X-Material Status

Hello

I don't know if only lead plant can change this parameter because affect all plants.

But I created some material and can't change material status to 49 or 50. I checked all that you said me Mr Pardha

Regards

Peter