on 05-13-2015 3:55 PM
Hi All,
Is it possible to determine when a job runs longer than it's usual run?
For example:
Job 1 is usually finished after 10minutes but today it finished after 1hour.
So what we need is a notification from this job when it runs longer than usual.
Or even a script with the list of all jobs with unusual run.
Thanks!
Alyssa
you need to configure ccms in rz21
R3BPLongJobs SAP-DEFAULT
R3BPLongJobs SAP-DEFAULT_OLD_007
R3BPLongJobsMSC SAP-DEFAULT
R3BPLongJobsMSC SAP-DEFAULT_OLD_007
R3BPServerSpecAbortedJobs SAP-DEFAULT
R3BPServerSpecAbortedJobs SAP-DEFAULT_OLD_001
R3BPServerSpecAbortedJobs SAP-DEFAULT_OLD_002
R3BPServerSpecAbortedJobs SAP-DEFAULT_OLD_003
R3BPServerSpecAbortedJobs SAP-DEFAULT_OLD_004
R3BPServerSpecAbortedJobs SAP-DEFAULT_OLD_005
R3BPServerSpecAbortedJobs SAP-DEFAULT_OLD_006
R3BPServerSpecAbortedJobs SAP-DEFAULT_OLD_007
and of course you need to cont with solution manager to give you notification.
Message was edited by: S Ahmed
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
You can use the runtime limit field for that on Definitions and Chains.
Regards Gerben
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
We do not know how long the jobs will run. What we just wanted is that for example,
The job runtime for the past weeks is average of 2mins, then today the runtime duration is 30minutes.
With this scenario the job should send an email that this job ran longer than usual.
Thanks in advance!
Regards, Alyssa
User | Count |
---|---|
81 | |
10 | |
10 | |
8 | |
7 | |
7 | |
7 | |
6 | |
5 | |
5 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.