on 05-20-2015 9:20 AM
Hi,
In ECC 6 EHP 7 upgrade, in phase "MAIN_SHDIMP/SUBMOD_SHD2_RUN/RUN_RSCPFROM_CRR_UPTIME" we are facing the below issue (we are using SUM tool patch 0 for SUM 1.0 SP13).
Last error code set: RFC error system DER nr 21 function
'SUBST_START_REPORT_IN_BATCH' failed with code 5 key BATCH_SCHEDULING_FAILED:
Number:000
Below the content of PSCPFROMCUT.LOG :
1 ETQ201 Entering upgrade-phase "MAIN_SHDIMP/SUBMOD_SHD2_RUN/RUN_RSCPFROM_CRR_UPTIME" ("20150519212517")
4 ETQ399 Set database connect to shadow.
4 ETQ399 Set environment for shadow connect:
4 ETQ399 Set RFC variables for shadow connect:
4 ETQ399 System-nr = '21', GwService = 'sapgw21' Client = '000'
4 ETQ380 computing toolpath for request "TP_SHADOW_CONNECT"
4 ETQ381 request "TP_SHADOW_CONNECT" means "tp needs to connect to shadow system"
4 ETQ382 translates to group "R3UP_TOOL_GROUP_NEW"
4 ETQ399 Requirement for tp maps to 'exe'
4 ETQ383 translates to path "/usr/sap/DER/SUM/abap/exe"
4 ETQ399 Set tool parameters for shadow connect with TPPARAM 'SHADOW.TPP'.
2 ETQ366 Connect variables are set for shadow instance access
4 ETQ399 System-nr = '21', GwService = 'sapgw21' Client = '000'
4 ETQ399 Environment variables:
4 ETQ399 dbs_db4_schema=R3DERDATA
4 ETQ399 auth_shadow_upgrade=1
1 ETQ206 Executing pre-phase DB specific actions.
1 ETQ200 Executing actual phase 'MAIN_SHDIMP/SUBMOD_SHD2_RUN/RUN_RSCPFROM_CRR_UPTIME'.
1 ETQ399 Phase arguments:
2 ETQ399 Arg[0] = 'RSCPFROM_CRR'
2 ETQ399 Arg[1] = 'SAP_CPFROMCRR_UT'
2 ETQ399 Arg[2] = 'NO-IGNORE;REMOVELOGS=RSCPFROM_CRR_COPYFROMSHD*\.$(SAPSID)'
2 ETQ399 Arg[3] = 'RSCPFROM_CRR_UT\.$(SAPSID)'
2 ETQ399 Arg[4] = '10'
2 ETQ399 Arg[5] = 'Copy selected tables from shadow'
1 ETQ399 Using error summary log 'RSCPFROMUT.ELG'.
1 ETQ399 Expanded phase arguments:
2 ETQ399 Arg[2] = 'NO-IGNORE;REMOVELOGS=RSCPFROM_CRR_COPYFROMSHD*\.DER'
2 ETQ399 Arg[3] = 'RSCPFROM_CRR_UT\.DER'
4 ETQ265 Starting report "RSCPFROM_CRR" with variant "SAP_CPFROMCRR_UT" in batch
1 ETQ359 RFC Login to: System="DER", AsHost="SAPDEV" Nr="21", GwHost="SAPDEV", GwService="sapgw21"
2 ETQ232 RFC Login succeeded
4 ETQ010 Date & Time: 20150519212525
1 ETQ233 Calling function module "SUBST_START_REPORT_IN_BATCH" by RFC
2 ETQ373 parameter "IV_ABORT_ON_ERROR" = ""
2 ETQ373 parameter "IV_AUTHCKNAM" = "DDIC"
2 ETQ373 parameter "IV_BATCHHOST" = "SAPDEV"
2 ETQ373 parameter "IV_JOBNAME" = "RSCPFROM_CRR"
2 ETQ373 parameter "IV_REPNAME" = "RSCPFROM_CRR"
2 ETQ373 parameter "IV_SCHEDEVER" = "X"
2 ETQ373 parameter "IV_VARIANTTEXT" = "copy from shadow w/o keys"
2 ETQ373 parameter "IV_VARNAME" = "SAP_CPFROMCRR_UT"
2 ETQ373 parameter "IV_LANGUAGE" = "E"
2 ETQ399 Table TT_REPORTPARAM (#2):
3 ETQ399 "LOGFILE","P","","","RSCPFROM_CRR_UT.DER",""
3 ETQ399 "ACTION","P","","","UPTIME",""
2 ETQ373 parameter "IV_BATCHINSTANCE" = ""
1EETQ235 Call of function module "SUBST_START_REPORT_IN_BATCH" by RFC failed (error-status "5")
2EETQ360 RFC of "SUBST_START_REPORT_IN_BATCH" failed:
2EETQ361 code/exception : 5
2EETQ362 key : BATCH_SCHEDULING_FAILED
2EETQ399 Number:000
4 ETQ010 Date & Time: 20150519212526
1EETQ399 Last error code set is: RFC error system DER nr 21 function 'SUBST_START_REPORT_IN_BATCH' failed with code 5 key BATCH_SCHEDULING_FAILED: Number:000
1EETQ204 Upgrade phase "RUN_RSCPFROM_CRR_UPTIME" aborted with severe errors ("20150519212526")
Please help !
Hi Laurent,
After checking shared log file,for me it's an issue which is related with SUM tool,for more on it please refer SAP Note 1791429 - SUM SP5: Inconsistencies after upgrade
As you're already using the latest one i.e SUM 1.0 SP13 but this could also be fishy,yes you need to wait for revert from SAP Support and you may need next patch for SUM 1.0 SP13.
Regards,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
One last attempt before we all wait . [ In case SAP response is slower ]
1838153 - How to get the logs when getting an error during the upgrade of a NetWeaver system
Please enable tracing and give a go . Please let us know if you find any logs that could help us .
Thanks ,
Manu
Have a look with SAP KBA 1976183 - Error " No resources currently available for RFC group" occurred at phase RSCPFROM_CRR fa...
Hope this will help you.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
What about the error log from RSCPFROMUT.ELG
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi ,
Couple of questions
1 ) Did you restart the server , after step1 [ replacaing the kernel files ] , if not perform the same .
2 ) Log into the system and check for any dumps in ST22
Thanks ,
Manu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Manu,
I'm using SUM tool patch 0 for SUM 1.0 SP13.
There is no more information in the log but when i'm connecting on the shadow instance i see that report "RSCPFROM_CRR" contains syntax error and the variant "SAP_CPFROMCRR_UT" doesn't exist.
I have raised an oss message since 2 days but i don't have any response.
Hi,
Could you restart the system as well as the SUM & would try again,If same issue persists share the updated logs.
Regards,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I already restarted system and SUM and nothing changed.
Which updated logs do you want ?
PSCPFROMCUT.LOG
1 ETQ201 Entering upgrade-phase "MAIN_SHDIMP/SUBMOD_SHD2_RUN/RUN_RSCPFROM_CRR_UPTIME" ("20150520120108")
4 ETQ399 Set database connect to shadow.
4 ETQ399 Set environment for shadow connect:
4 ETQ399 Set RFC variables for shadow connect:
4 ETQ399 System-nr = '21', GwService = 'sapgw21' Client = '000'
4 ETQ380 computing toolpath for request "TP_SHADOW_CONNECT"
4 ETQ381 request "TP_SHADOW_CONNECT" means "tp needs to connect to shadow system"
4 ETQ382 translates to group "R3UP_TOOL_GROUP_NEW"
4 ETQ399 Requirement for tp maps to 'exe'
4 ETQ383 translates to path "/usr/sap/DER/SUM/abap/exe"
4 ETQ399 Set tool parameters for shadow connect with TPPARAM 'SHADOW.TPP'.
2 ETQ366 Connect variables are set for shadow instance access
4 ETQ399 System-nr = '21', GwService = 'sapgw21' Client = '000'
4 ETQ399 Environment variables:
4 ETQ399 dbs_db4_schema=R3DERDATA
4 ETQ399 auth_shadow_upgrade=1
1 ETQ206 Executing pre-phase DB specific actions.
1 ETQ200 Executing actual phase 'MAIN_SHDIMP/SUBMOD_SHD2_RUN/RUN_RSCPFROM_CRR_UPTIME'.
1 ETQ399 Phase arguments:
2 ETQ399 Arg[0] = 'RSCPFROM_CRR'
2 ETQ399 Arg[1] = 'SAP_CPFROMCRR_UT'
2 ETQ399 Arg[2] = 'NO-IGNORE;REMOVELOGS=RSCPFROM_CRR_COPYFROMSHD*\.$(SAPSID)'
2 ETQ399 Arg[3] = 'RSCPFROM_CRR_UT\.$(SAPSID)'
2 ETQ399 Arg[4] = '10'
2 ETQ399 Arg[5] = 'Copy selected tables from shadow'
1 ETQ399 Using error summary log 'RSCPFROMUT.ELG'.
1 ETQ399 Expanded phase arguments:
2 ETQ399 Arg[2] = 'NO-IGNORE;REMOVELOGS=RSCPFROM_CRR_COPYFROMSHD*\.DER'
2 ETQ399 Arg[3] = 'RSCPFROM_CRR_UT\.DER'
4 ETQ265 Starting report "RSCPFROM_CRR" with variant "SAP_CPFROMCRR_UT" in batch
1 ETQ359 RFC Login to: System="DER", AsHost="SAPDEV" Nr="21", GwHost="SAPDEV", GwService="sapgw21"
2 ETQ232 RFC Login succeeded
4 ETQ010 Date & Time: 20150520120112
1 ETQ233 Calling function module "SUBST_START_REPORT_IN_BATCH" by RFC
2 ETQ373 parameter "IV_ABORT_ON_ERROR" = ""
2 ETQ373 parameter "IV_AUTHCKNAM" = "DDIC"
2 ETQ373 parameter "IV_BATCHHOST" = "SAPDEV"
2 ETQ373 parameter "IV_JOBNAME" = "RSCPFROM_CRR"
2 ETQ373 parameter "IV_REPNAME" = "RSCPFROM_CRR"
2 ETQ373 parameter "IV_SCHEDEVER" = "X"
2 ETQ373 parameter "IV_VARIANTTEXT" = "copy from shadow w/o keys"
2 ETQ373 parameter "IV_VARNAME" = "SAP_CPFROMCRR_UT"
2 ETQ373 parameter "IV_LANGUAGE" = "E"
2 ETQ399 Table TT_REPORTPARAM (#2):
3 ETQ399 "LOGFILE","P","","","RSCPFROM_CRR_UT.DER",""
3 ETQ399 "ACTION","P","","","UPTIME",""
2 ETQ373 parameter "IV_BATCHINSTANCE" = ""
1EETQ235 Call of function module "SUBST_START_REPORT_IN_BATCH" by RFC failed (error-status "5")
2EETQ360 RFC of "SUBST_START_REPORT_IN_BATCH" failed:
2EETQ361 code/exception : 5
2EETQ362 key : BATCH_SCHEDULING_FAILED
2EETQ399 Number:000
4 ETQ010 Date & Time: 20150520120114
1EETQ399 Last error code set is: RFC error system DER nr 21 function 'SUBST_START_REPORT_IN_BATCH' failed with code 5 key BATCH_SCHEDULING_FAILED: Number:000
1EETQ204 Upgrade phase "RUN_RSCPFROM_CRR_UPTIME" aborted with severe errors ("20150520120114")
Hi
Perform the same once again but after doing the following
Thanks ,
Manu
Hi
What is your environment ( OS/ DB ) . Check whether the following Note is applicable to you
2147596 - IBM i: Solution for syntax error in ABAP after parallel transports
2148771 - IBM i: HotNews: Syntax error in ABAP after parallel transports
Thanks ,
Manu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Believe the Note is applicable to you .
Follow as suggested in SAP Note 2147596 - IBM i: Solution for syntax error in ABAP after parallel transports
See that your system is development , Parallelly raise a OSS message with SAP
Thanks ,
Manu
Below part of the note that I applied :
3) During an upgrade or update:
I have downloaded :
- lib_dbsl 422 for the source kernel (721_EXT)
- lib_dbsl 111 for the source kernel (742)
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.