on 05-21-2015 7:21 AM
Dear Experts,
Below is my scenario.
I have a material with strategy type 11, mixed MRP 2 and availability check 02. In plant i have existing stock 10. I have 2 stock transfer requisition of 240 and 30. When running MRP in MD03 system deducting existing 10 qty and creating PO of 260 qty.
Should strategy 11 consider the existing stock? I want MRP to create PO for 270 and leave the existing stock alone. How should I proceed?
Rajib,
Planning strategy 11 won't consider the warehouse stock in standard.
Do you have assigned any special procurement key with alternative plant if yes check the planning strategy in other plant?
Please share us the snap shot of your MD04.
BR
KK
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Kiran,
Let me explain my scenario here again. I have a material which exists in plant 4000 and 9000 both. Demand is entered in 4000 in form of sell order/PIR. Strategy 40 is maintained in 4000. We will run MRP in 4000 which will create STR in plant 9000. If any stock exists for the material in 9000 MRP should not consider them. Strategy 11 is maintained in 9000. But MRP is deducting the existing stock.
Below are the MD04 screenshots for both plants.
Rajib,
I think this is standard behavior of the system because your requirements in plant 9000 are from alternative plant 4000,To confirm this behaviors just delete those requirements in sandbox and create a new direct requirement in 9000 and see if those consider existing stock.
To achieve your requirement I suggest you use BADI MD_CHANGE_MRP_DATA to restrict system from considering the available stock.
BR
KK
User | Count |
---|---|
100 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |