on 05-21-2015 5:27 PM
Hi,
i have a question about how to change bin or add bin for a TO by RF(LM07)?
the buesiness:
1, SAP create TO 10 PC from 902 to PC1 PC1-A0101 bin;
2. when confirm To putaway 8 PC to PC1-A0101bin and 2 PC to PC1-A0102bin;
as i know , i cannot add a new bin for this TO, but how to do this?
At LM07 screen you have F7-NBin using which you can enter the new bin PC1-A0102 (Quantity breakup is not possible) provided your configuration is in place to change the destination bin during confirmation
LM07 Screen
Configuration LE---WM---MASTER DATA----DEFINE STORAGE TYPE
Quantity breakup is possible only with difference indicator but in that case your Bin (PC1-A0102) will be static in all the case of difference quantity
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Quantity breakup is not possible in standard
Could you please share what is the need to breakup the quantity and store in two separate physical bin as system propose the bin based on the putaway strategy and other putaway related parameter. Might be the information supplied by you will help us to propose the solution to you
User | Count |
---|---|
98 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.