   i have a question about how to change bin or add bin for a TO by RF(LM07)?

the buesiness:

1, SAP create TO 10 PC  from 902 to PC1   PC1-A0101 bin;

2. when confirm To putaway  8 PC to PC1-A0101bin and 2 PC to PC1-A0102bin;

as i know , i cannot add  a new bin for this TO, but how to do this?

Accepted Solutions (0)

Answers (1)

Answers (1)

MANIS
Active Contributor
0 Kudos

At LM07 screen you have F7-NBin using which you can enter the new bin PC1-A0102 (Quantity breakup is not possible) provided your configuration is in place to change the destination bin during confirmation

LM07 Screen

Configuration   LE---WM---MASTER DATA----DEFINE STORAGE TYPE

Quantity breakup is possible only with difference indicator but in that case your Bin (PC1-A0102) will be static in all the case of difference quantity

Former Member
0 Kudos

Thanks for your reply.

if i set the field is “1”, i can change bin during confirm TO, i only putaway single bin ,but i want to putaway two bins(pc1-A0101 and PC1- A0102), how to do?

MANIS
Active Contributor
0 Kudos

Quantity breakup is not possible in standard

Could you please share what is the need to breakup the quantity and store in two separate physical bin as system propose the bin based on the putaway strategy and other putaway related parameter. Might be the information supplied by you will help us to propose the solution to you