hi all,
is there a possibility to create a planned order with the sales order loading automatically assigned?
we already created the Sales Order in MD81 with requirement type "KE- Indiv.cust.ord. w/o consumpt".
regards,
Mendes
Hi Joao,
You can use strategy 81 in material master under MRP3 tab. This will directly create a planned order.
Further you can check here
Special Settings for Planned Orders - Assembly-to-order (LO-ASM) - SAP Library
Hope this helps and solve your issue. Let us know did it worked.
Regards
Rahul
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi Rahul, thanks for your reply.
I have set the 81 as strategy to the material and used the KMSE to create the sales order but when I create the Planned order manually the Sales Order is not coming assigned to the planned order automatically.
Is it possible to make this or do I have to run something to create the planned orders automatically?
regards,
Mendes
EDIT: we runned MRP and the planned orders were created automatically.
thanks, Rahul.