Hi All,
I have an issue ,
When I am entering the sales order with some 10 qty and my requested date is on 26.05.2015. When i Click on availablity check I am able to get the response for two schedules
First schedule 6 qty on 01.06.2015
Second Schedule 4 qty on 05.06.2015.
When I click on the tick mark the system is not updating the schedule line in the schedule lines tab it is just showing on 26.05.2015 as zero quantity in a single line.
i have checked for AVC check configuration but all are seems to be correct. Stock is there . ?
Could you please suggest what could be wrong ?
Please see the attach screen shot ATP1, ATP2 and ATP3.png
Hi Kumresh,
Which tick you clicked out of the three in ATP2 screen shot?
Could you let us know. Try to click first and see results. It should take 6 pieces. If that's the case then I hope it gives you an understanding.
Regards
Rahul
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Thanks for your reply.
If I click any tick mark also , I am not getting the schedule updated in the schedule lines tab
What ever tick mark I select the result I am getting in the schedule lines tab is in the screen shot ATP3.png.
I mean nothing is getting updated in the schedules . Is this any configuration issue or Should I need to debug and check
Hi Kumaresh,
Whats the status in customizing for sales area, is it A, B or C. Check under this path;
Sales and Distribution - Basic Functions - Availability Check and Transfer of Requirements - Availability Check - Availability Check with ATP Logic or Against Planning - Define Default Settings.
Plus also check OVZI, OVZ8 & OVZ9.
Regards
Rahul
Hi Thanks for your reply.
Whats the status in customizing for sales area, is it A, B or C. Check under this path;
Sales and Distribution - Basic Functions - Availability Check and Transfer of Requirements - Availability Check - Availability Check with ATP Logic or Against Planning - Define Default Settings
Ans:- It is E for the sales area .
Is It right ? or should I change it to A or B or C .
In
OVZI - it is - Item category = TAN , TYPE= PD , RqTY= 041
In
OVZ8 - it is - For CP= AVC = Tick mark , Rq= Tick mark , All= Tick mark
In
OVZ9 - it is - AVC = CH , CRI = A
If i select that in details tab
Tick mark for the following fields
Inc purchase orders
incl purchase rquestions
incl dependent reqs
incl reservations
incl sales reqmts
incl deliveries
incl ship. notification
Checked for the following fields
incl rel order reqs
incl planned orders
incl production orders
Hi Kumaresh,
Instead of E change it C, plus most important you are using availability check as CH. What have you maintained in material master 02 or CH. Put 02 in material master as it checks for stock also and same you can see in OVZ9 for 02/A.
Not sure have you triggered product allocation coz of requirement or was testing something in OVZ8.
Try this and let me know if it resolved the issue.
Regards
Rahul
Hi Rahul ,
Thanks for your reply.
I have changed to C , and also I have changed to 02 in material master.
But i am not able to get the schedule lines updated in the schedule lines tab.
I am able to get the avc check when I click on the avc check
The problem is once I click on the tick mark it has to update the schedule lines . It is not updating .
The confirm qty is updating has "0" in schedule lines tab