I have  interesting issue.. For some production orders BOM is not flown,

BOM Valid from date is okay   ECN is okay.There are no changes in the BOM

Interestingly BOM flown correctly to the succeeding and preceeding orders.

This Issue is for 4 orders. Can you please suggest.

Regards,

Srihari.M

Accepted Solutions (0)

Answers (5)

Answers (5)

Former Member
0 Kudos


Hi Friends,

THe BOM is flown correctly for the succeeding and preceeding orders only there is issue in 4 orders so there will not be any issue in Bs22, we haven't done any config changes.

There are no  change documents in CS02/CC07.

The BOM status in the Production Order is '0' from where this was flown.

Can anybody clrify.

Regards,

Srihari.M

Gopinath_Ram
Participant
0 Kudos

Hello Sriahri,

Have assigned any Plant specific material status in material master for the components or header material?

did you get any error while running Read PP master data?

Please let me know your inputs .

Regards

Gopinath R

Former Member
0 Kudos

Hi Srihari,

You need to check BOM status in CS02 / CS03 and not in production order. If the status of BOM header is set to "Inactive" in CS02 then system will not explode BOM while creating production order. User can still create order but system will show BOM status as 0 in production order CO02 / CO03.

In you case, I guess BOM was made inactive for some time. During that period user created 4 orders for which BOM was not exploded and then it was again set to active status.

please check this possibility in your system,

Regards,

Rohit

former_member193808
Active Contributor
0 Kudos

Dear Srihari,

If you had previous orders, then the BOM was modified at the time of order creation (the 4 orders which you see issue). You can check the BOM change documents to identify the issue in that case.

Go to CS02/3. Go to Header.

Click on Environment -> Change documents.

Select "Full" to know what had happened, or choose "Document overview" to see each document. Click on document and you can see "Field description" which shows what had happened

Thanks

Prem

Former Member
0 Kudos

Hi Rohit,

The BOM changed on 20.03.15 but when we checked in CS02 document changes only componenets are changed  are appearing.

Where we get the BOM staus changed from 1  to 0.

Regards,

Srihari.M

Former Member
0 Kudos

Hi Srihari,

Please go to BOM in CS02 and then Environment > Change Documents

Once you get to change document screen, click on "Document overview" button. You will get the list of change document. Double click to get the details of Oold & New entries.

For BOM status it will look somthing like this:

Check when status was changed from 01 to 02 or (from active to Inactive).

Regards,

Rohit

Former Member
0 Kudos

Hi

These are no status chage records..

Regards,

Srihari

former_member193808
Active Contributor
0 Kudos

Hi,

Your order status itself shows NMAT, which means no material component. This status gets assigned when you create the order. As you have not forbidden the BOM checks in BS22, system checked if BOM is present or not, when the order was created. You must have got a warning while creating the order. So, the order is created without BOM, and the documents posted (DLV and CNF status present).

If you have created a BOM for this material, new order will be created properly.

To test this, you can create a new material, create routing then try creating an order (without BOM). System will give warning, but you will be able to create (Or set forbid rule in BS22) the order and status will be NMAT.

Thanks

Prem

Former Member
0 Kudos

Hi Srihari,

Could you please check if BOM is active on 09.01.2015 ? are you using change numbers ?

Regards,

Rohit

pardhreddyc
Active Contributor
0 Kudos

Dear,

Check the validity period of BOM assigned and BOM application for this material.

Did you create Routing for this material? and also check the material master for "Basic data -2" in Basic material.

Regards,

Pardhu

Gopinath_Ram
Participant
0 Kudos

Hello Srihari,

Could you please try to do Read PP master data in production order and let me know if you get any error.

Regards