cancel
Showing results for 
Search instead for 
Did you mean: 

Bica:Problem with loading the data with new date range

0 Kudos

Dear experts!

WE try to load the data by the bica Into the pas From bw.We have the  bex with many rows thow we decides to load the bex by two steps :

the first time year 2013 and the next time 2014.We loaded the bex with data (schema and data ) of 2013  after the i changed bex the date range set to 2014.

i loaded  the  new data of 2014 (schema and data ) with the bica into pas  but i dont see the data of 2014 in the pas only data of 2013.

HOw it possible to load the data in my case?

What is wrong in my steps?

best regards,

BEanyamin Orit.

Accepted Solutions (1)

Accepted Solutions (1)

0 Kudos

DEar friends!

WE found the solution of the problems.The bex with 2014 doesnt have full data - only 10 month of 12  But restriction in the bex was 01.2014-12.2014.it makes the problem with the data.

BEst regards Orit

Answers (0)