Schedules are prepared and inspection lots are generated automatically, But RR and UD is not done since 1 year.
we want to bring online. how to mass close this lots.
Hi,
the way I used in this case was changing the standard report for automatic UD , RQEVAI30 (transaction QA10). The standard works only for OK-lots (like QA16) and does quiet some checks on master data and statuses.
So you could copy it into customer namespace and check in debugging in which place it rejects the lots you want to close from its selection. Based on this you can change your report to let it select the lots and perform UD. This should work for most cases but there are many dependencies.
Regards,
Lars
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
You might want to consider the following:
Transaction QA16 Collective Usage Decision for OK Lots
Transaction QE72 Tabular Results Recording
And to force close inspection lots, have a look a this SCN discussion:
http://scn.sap.com/thread/1869120
Regards
John
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
88 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.