cancel
Showing results for 
Search instead for 
Did you mean: 

Default revesion level when creating a material

suresh_bachan
Active Participant
0 Kudos


Hello,

Revision levels are assigned to a material basically with an engineering change notice or during material master processing (eg. GR).

Is there any possibility to assign automatically a pre-defined revision level to all materials newly created for a plant?

Thanks for your help

Accepted Solutions (1)

Accepted Solutions (1)

former_member191252
Active Participant
0 Kudos

There are many forum discussion on this.Please go through this forum link.

https://scn.sap.com/thread/1953005

Revision level can be done through Material Master or through ECM.

Hope this is helpful.

--

Answers (2)

Answers (2)

suresh_bachan
Active Participant
0 Kudos

According to all searches I made, there is no way in the standard SAP to assign automatically a revision level.

We have created an ABAP program which will detect all new materials of the day and assign automatically a predefined revision level

former_member185558
Active Participant
0 Kudos

Do you mean extending MM to MRP view or creating a new material with MRP View?

To do that automatically I think you would need to implement using Material BADI.

regards