on 06-26-2015 9:08 PM
Dear All
We have changed a new CCS (Cost component structure ) from A1 to A2 with new validity date starting 01-06-2015.
But While executing CK40n / CK11n system thorugh a below error
Cost comp. structures for costng variant XXXX in plant XXXX differ fromplant ABC1
Message no. CK346
Diagnosis
Special procurement of a material from plant XXXX for plant ABC1 is not possible because the costing variant RNRL is assigned to different
cost component structures in the two plants.
Thanking you
MKR V
Hi,
Check the cost component structure assigned to the 2 plants. It should have same structure.
Regards,
Mukthar