Cost comp. structures for costng variant XXXX in plant XXXX differ fromplant ABC1

Former Member
0 Kudos

Dear All

We have changed a new CCS (Cost component structure ) from A1 to  A2  with new validity date starting 01-06-2015.

But While executing CK40n / CK11n  system thorugh a below error

Cost comp. structures for costng variant XXXX in plant XXXX differ fromplant ABC1

Message no. CK346

Diagnosis

Special procurement of a material from plant XXXX for plant ABC1 is not possible because the costing variant  RNRL is assigned to different

cost component structures in the two plants.






Thanking you

MKR V

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member198650
Active Contributor
0 Kudos

Hi,

Check the cost component structure assigned to the 2 plants. It should have same structure.


Regards,

Mukthar