on 06-26-2015 11:46 PM
Hi Team,
We have a requirement of INDEPENDENTDEMAND@PERPRODLOC key figure in S&OP on-premise 3.0.2.2 version. Is there a workaround to achieve this?
Is there a way to add demand to DEPENDENTDEMAND key figure by changing the formula of DEPENDENTDEMAND key figure to:
=IF ("LOCID=''XXXX'', (DEPENDENTDEMAND + INDEPENDENTDEMAND), DEPENDENTDEMAND)
LOCID here will be manufacturing location only.
Supply Algo used: Unconstrained D/S (No Shortage)
Alternate way for this is by creating a dummy customer or setting higher safety stock but we want to keep that as option 2.
Thanks for your inputs.
Regards,
Aditya G
Hello Aditya,
Have you tried creating a KF Independentdemand @perprodloc and then mark it as 'Input for supply planning'. I think this way it should consider it as input along with dependent demand at the manufacturing location.
Thanks,
Rohit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Rohit,
Current calculation ->
NETDEMAND = DEPENDENTDEMAND considering sourcing quota as 1.
PROJECTEDINVENTORY = PRODUCTION - NETDEMAND
Suggestion -> NETDEMAND = DEPENDENTDEMAND + INDEPENDENTDEMAND
As per the current calculation, PROJECTEDINVENTORY = INDEPENDENTDEMAND
Below is the example:
Please guide.
Regards,
Aditya G