on 07-01-2015 9:10 AM
Hi All,
I have created production order & done goods issue. The component 0307-2619CFE only requires 294.000 pcs, but actual withdrawn 794.000 pcs,
CO02 screen 0307-2619CFE Component here showing 294 req quantity
After I have cross checked in MIGO showing 794 quantity.
I need your useful help..Thanks team.
Thanks to all,
Actually for this issue they have maintained some discontinues material in MRP-2 view. I gave some analysis to related discontinues material, after user has agreed to close this issue.
Thanks to all
thanks for your valuable support.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
You can check in Production order --> Documented goods movement check with indicator for Planned goods issue & unplanned goods issue.
Regards,
Vaibhav Kurde
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Chandra,
Can u check is there any fixed Qty in the BOM component....?
and also let me know is the warehouse managed component ??
Regards
KK
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Chandara..
One more obseravtion here...
You backflush 500 qty more compare to requirement, which is indiacted some one changed the qty during the confirmation as Expert Rahul mention.
You can cross check for 1 qty in other system for same material and confirm.
There is no logic in SAP to backflush the 500 excess qty compare to requirement.
Please check with your team and confirm.
Regards
Umesh Mali
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
See by any logic system can't put 794 until unless you say that production order qty was 132,33 (794/6) which I doubt. More or less it seems posting error by changing quantity (which lets assume happened unintentionally). Now you will have to reverse the booking so that you can post correctly and for future try to put authorization, so that user can't change the quantity if its not allowed.
Regards
Rahul
Hi Roopesh,
I have one issue related to MRP but I am not able to solve since month. Could you suggest me...
At-least I want to know how to involve MRP issues. What are settings I want to check..?? I know standard MRP behavior but coming to issue I am not able to resolve. So can you help me come out of this issue.. I have tried you contact in IBM same time but I didn't get.....
Thanks
regards
chandrashekhar
8019827557
Hello chandra,
to get more clarification how it consumed more than requirement quantity
1) please check production order 100002356504 confirmation goods moment details for this operation no 0030
2) you can also check how the consumption happens for this material @ AFRU table (either how much is planned & unplanned).
I hope it will help
Best Regards
Venky
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Chandra
If you consider CO02 as 294 then withdrawn is 794. Let's first be clear with decimal notation. Are you using 1234.34 or 1234,34?
If this has been over-booked then it needs to be cancelled. How are you doing to backflush, automatic or manual posting?
Regards
Rahul
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Chandra,
Is this material marked for backflush ? or this posting carried out manually ? Since the requirement quantity in order is 294 chances are that 794 was posted manually.
Regards,
Rohit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Chandra,
Just because material is backflushed doesn't mean there is no chance of manual intervention. You can any time go to goods movement tab of CO11N and change the quantity of material from required quantity.
If user has sufficient access then he/she can post 261 with changed quantity even if backflush indicator is marked.
Regards,
Rohit
User | Count |
---|---|
99 | |
9 | |
9 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.