Hi

Can it possible to replace valid from date for every controlling object like cost center with created date stored in MDG after replication?

My requirement is to create cost center with created date and valid from date same, not as per edition.

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member206605
Active Contributor
0 Kudos

Hello Sanjay

In ECC its possible but in MDG its not feasible without Edition. You can create daily edition and release it. That is the only option.

May be it can be feasible in MDG 8 but not sure.

Kiran

Former Member
0 Kudos

Hi Kiran

Can it possible to create on fly edition for every change request?

former_member206605
Active Contributor
0 Kudos

Hello Sanjay

I think you have you create the edition first and then CR...