cancel
Showing results for 
Search instead for 
Did you mean: 

Hi I have delimited position 01.01.2007 to 01.01.2010. now i want to use same position with new start date 01.01.2015 to 31.12.9999. how can i do it.

Former Member
0 Kudos

Can anyone help me.

Accepted Solutions (1)

Accepted Solutions (1)

jagan_gunja
Active Contributor
0 Kudos

You can assign a position to an employee only for the period/s when the position object (i.e., HRP1000) is valid.

In PPO3 txn, to extend the position from the last delimited date here in your case 01.01.10, copy the object row to the new period as 01.01.15 to 31.12.9999.  If copying is not allowed, insert a new object row for the period.  Then you will see two rows of the object for the two periods.  You can also copy from the next date after the delimited date.

After this, go to txn PA40, to assign the position to an employee. 

Answers (3)

Answers (3)

former_member182377
Active Contributor
0 Kudos

Hi anand,

Check the position which you want to maintain from 01.01.2015 has the end date 01.01.2010, if yes maintain the vacancy in IT1007, and run hiring or whatever action from 01.01.2015 and assign this same position in IT0000.

It will work, any challenges let me know.

Thanks

Sriram

Former Member
0 Kudos

HI,

when i am trying to hire new employee with same position( which is delimited ),

its showing error is  position is not available for that period.how can i do it

former_member182377
Active Contributor
0 Kudos

Hi anand,

Check in PP01 what is the dates have been maintained in A008 relationship..

Can you show that please?

Thanks

sriram

Former Member
0 Kudos

This message was moderated.

Sanky
Active Contributor
0 Kudos

Hi,

Check position details PO13 tcode and check relationship validity date.

Regards,

Sankarsan

0 Kudos

Infotype 1000 - Object has a time constraint that does not allow any gaps (SAP standard). This means that when you extend the validity to start from 01.01.2015 it will actually undo the delimit on 01.01.2010 and carry on to 31.12.9999.

The main thing you can change is around the description from 01.01.2015.

Go to PP01, enter the position number and click the Object infotype. Click copy and set the date to 01.01.2015 along with the new description.

Repeat the copy process with all other relevant Infotypes.

Sanky
Active Contributor
0 Kudos

Hi Anand,

From 02.01.2010 onwards this position is vacant and now you would like use this position from 01.01.2015.

You can use and assign an employee for this position from 01.01.2015 then system will automatically create a new record for this position from the date 01.01.2015 with new pernr no.

Regards,

Sankarsan