on 07-13-2015 4:17 PM
Hi Experts,
I am here to get a quick clarification on NWDI track configuration.
I would like to know how it is possible to configure more than four runtime systems, like two development, two test, two consolidation and two production (one actual production another someting like backup of production) while creating/configurating a NWDI track.
I do not want mutiple tracks rather one track to represnt my entire landscape.
In CMS, Landscape Configurator -> Track Data, it gives option to add maximum of four Runtime Systems.
I did not find any suitable SAP notes for this special feature/configuration. Any useful information will be appreciated, thanks.
I checked the below SCN thread, where Option 1 and 2 we do not consider at this moment. Option 3 is just a workaround to create another new track which we do not want. I wanted to check if anything new has been added into NWDI featue since 2008.
Regards,
Sujit Kumar Banerjee
i don't think you can do with nwdi,
you can try CTS+, which may help.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Sujit,
By design you can configure 4 runtime systems in NWDI and that has not changed.
Cheers,
Peter
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
84 | |
24 | |
11 | |
9 | |
7 | |
6 | |
5 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.