on 07-22-2015 1:55 AM
Also look into these threads:
Cancel UD with  QEVA0008 | SCN
You have several such in SCN on this topic.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Use program RQEVAC50 to cancel the Usage Decision, (by having a Z-tcode to this program) so that the material will be back to previous status.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You can reverse the UD decision on the inspection lot which will reverse the Material Documents posted.
Then you can do fresh GRN to create another inspection lot. 175842 - Inspection lot: Reversal of goods movements from usage decision
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
8 | |
7 | |
4 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.