on 07-24-2015 11:15 AM
A serial number created in SAP ECC has to pass through 4 BOM levels and each level has separate Routing,own material and operation till the finished product. the S/N of the produced part needs to be the same as the S/N of the component.
For Ex Serial Number : XYZ .This S/N or SFC has to pass through A,B,C,D and
A - Routing A -Good Issue is done at the last step and production order created for B
B - A (Consumed)+ own material + Routing B - Good Issue and Goods Receipt is done at the last step and production order created for C
C - B (Consumed) +own material + Routing C - Good Issue and Goods Receipt is done at the last step and production order created for D
D - C +(Consumed) +own material+ Routing D - Good Issue and Goods Receipt is done at the last step
how can we achieve this SAP ECC -----SAP ME
Hi,
Production orders for each of the 4 materials must be released with their specific BOMs and routings. Once A is produced it gets into inventory and can be used in B as a component, and so on until D is produced and shipped.
Regards,
Konstantin
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Kishore
If the component is purchased, with an external serial number then you can make an SFC with the same number as this. Then use SAP ME's Change Production to process the same SFC number through each of the 4 different Order/Routing/BOM/Material changes. It is fairly common to do change production for this type of processing.
Stuart
Just found that there is feature in SAP MEINT where you can transfer production order with the serial number . will this work in this scenario .I guess the serial number are visible in the "serial number" tab of "Shop Order maintenance" . So in this case Konstantin suggestion may work while updating the stock to ECC . Your thoughts . will check the both the Scenario and confirm . The serial number is just to track where exactly it is router i.e A ,B,C etc . Thanks Kishore
Thanks Stuart for the help . That solved by issue almost.However i have few more ,sorry .
1. SAP ECC ,if I Create one production order with multiple serial numbers ,Say for example 20 serial numbers ,when moving it to SAP ME is there a out of the box feature where i can create 20 shop orders( 1 shop order for 1 serial number ) automatically or how can this be achieved .
or vice versa from SAP ME to SAP ECC
2 .Change production is best way to go , in this case does SFC should be same as serial number ?. the reason am asking is i can internally use different SFC number for routers but keep the serial number as reference and post the goods (GI and GR ) to SAP ECC at the last operation of the route step . I think its not possible ?
3.If i use this SFC in Sampling does that allow me to use change production functionality .
Thanks Kishore
Stuart - Above you mentioned that serial number will have a 1-1 relationship with a released SFC number. So i thought we have to create that way . The requirement is in SAP they create one production order for each serial number for tracking however we have take a decision which is best approach whether to create a production order with N serial number in ECC or SAP ME .if SAP ME how can we achieve it . so your are saying that i create a shop order with N SFC numbers and transfer it to ECC as a production order with serial numbers using MEINT .
Regards
Kishore