Hi Team ,
Does SAP ME have out of box features to check the material reservation regarding the issuing plant ?
Thanks
Kishore
When PO is released component materials can be reserved for the specific PO consumption and it's moved from central to manufacturing storage location that is managed by ME site.
Regards,
Konstantin
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks Konstantin .
I read somewhere we can raise a PO with material reservation in ECC and pass it on to SAP ME . However when PO alone is raised ,then from SAP ME how can i check whether the material is reserved for this PO or not . so you are saying it automatically checks material reservation even though that was configured after the PO is sent to ME .
Thanks Kishore
When PO is released with material reservation, goods movement happens and materials are transferred to a production storage location triggering corresponding INVCON02 message to ME. Invenroty is imported with a link to PO and can be checked in Floor Stock Report by drilling down into details.