on 08-03-2015 4:16 AM
Hi Gurus
For put away strategy P and mixed storage A system allows to place different materials or different batch in the same bin. For this strategy we define the storage bin sections A or B. Then assign those sections to the combination of storage type, storage bin type and storage unit type.
We cannot change strategy because we need the system propose a specific SU during the removal process.
Kindly help on how to proceed with this bug.
The situation is similar to scenery showed in threat but it´s locked without final solution.
Thanks in advance
Regards
.
Hi Ismael,
If you check the F1 Help for Mixed Storage in the storage type control (transaction OMM3), you will see:
" A " Several Storage units with the same material per bin
Several different materials or batches of a material may occupy a storage bin at the same time. However, the individual storage units must contain the same material and/or batch number.
Kindly view the other options for Mixed Storage to suit your requirement. If you require only one specific material & batch per bin, leave Mixed Storage field blank.
You may also find this documentation helpful:
Strategy P: Storage Unit Type - Warehouse Management System (WMS) - SAP Library
Regards,
Neil
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
It is locked because a fresher who had not read the forum rules necromanced it.
People expect answers and not that other people add their questions to old discussions.
Aren't you from SAP? The icon is displayed next to your name. Shouldn't you help us to get the answer to this question? Don't you have an internal help desk?
By the way, you did not even explain what bug you have.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
you have to provide more input.
What transaction do you use for putaway? was the destination bin changed during confirmation? was the destination bin found by automatically? Is the destination bin different from the source bin? Is it Handling Unit managed?
Can you show a screenshot from the bin from LX02 showing all the important info like batch SU number, material number ..
Had you searched for OSS notes, searching with mixed storage A returns 83 results after restricting them to application area LE, among them e.g. 1365803 - 'Mixed Storage' indicator ignored at TO creation (2)
Dear
Excuse my late input
Of course . we already searched in OSS, regarding 1365803 there are not TO with pending confirmation. We have also looked in blogs and consulted colleagues. Even we tried with other movements type and changed strategies to storage type, storage section and storage bin type.
Really appreciate any suggestion, tip or light
Regards
User | Count |
---|---|
99 | |
9 | |
9 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.