on 08-03-2015 11:40 AM
Dear Experts;
I have a SAP project and customer wants to use more than 10 activities. As you know we can not use more than 6 activities in a work center.
What I know, There are two possible to solve this issue.
1- Duplicate work center and routing-- This way is not usefull for PP Module.
2- Using template allocation.
There is two part
- Actual - it is ok
- Standart cost estimate - This part is main issue and I have tried a lot of way to solve it but I could not.
After I solve the issue with your help I will prepare a document for sharing.
I have 17 activities which are from A100 to A116 and six of them will work with work center. (A100 to A104 and A107)
Steps;
1- CPT1 - I have created a template;
Type: cost center/activity type
Description: Bla bla
Object:
SenderCostCenter = '13211001' AND
SenderActivityType = 'A107'
(sender cost center is production cost center and linked work center, however the activity price entered with KP26 for all 16 activities)
Plan Quantity: I have used several function and none of them worked.
1- BomItemAlternativeQuantity( AlternativeQuantityUnit =
MaterialBaseQuantityUnit,
ConditionField = BomItemComponents,
ComparisonValue = '13211001' )
Did CK11N - Nothing for other activities
2-
PlanQtyForAtypWorkCenter( WorkCenter = 'T-EF-01', CalculationType = '1',
FiscalYear = CurrentFiscalYear, ActivityType = RoutingOpActivityType,
Version = ActualVersion )
OR
PlanQtyForAtypWorkCenter( WorkCenter = 'T-EF-01', CalculationType = '1',
FiscalYear = CurrentFiscalYear, ActivityType = 'A106' ,
Version = ActualVersion )
Both Same results; nothing for other activities.
3- I did this just for seeing can I see the CK11N difference.
If I did like following;
PlanQtyForAtypWorkCenter( WorkCenter = 'T-EF-01', CalculationType = '1',
FiscalYear = CurrentFiscalYear, ActivityType = RoutingOpActivityType,
Version = ActualVersion )
I have something but it is not what ı want. This data comes from KP26 not related routing.
I have to relate it following routing.
After the tests I thought I have chosen wrong object. I did
SenderCostCenter = '13211001' AND
SenderActivityType = 'A107' but this should be wrong because it is not related to routing.
So I have changed the object.
Till now every thins seems nice but whenI tried to save it I got following error
It says there is not standart value but there it is
See following standart value;
I thing still there is no connection with routing.
--- next I have tried following not worked
Any idea? am I missing some point.
Dear Experts;
Any idea?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
85 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.