Multi Plant Explosion (CS12) and Special Procurement Type (marc-sobsl)

Former Member
0 Kudos

Hello guys,

We have different BOM levels and these BOM are manufactured in different plants..we use two  Spec. Proc. Types (MRP View) : Physical Transfert (U) and Withdrawal from alternative Plant...

The problem is :

CS12 explode correctly all the levels in different plants when we use Withdrawal between the plants.

But we use Transfert type, explosion is stopped.

This problem appears just for CS12, because  MRP explode correctly all the levels...

Thanks foy your help/

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member184670
Active Participant
0 Kudos

Hello,

What is the  Procurement Type & Special Procurement key maintained for the Material in MM02.

Regards,

Sundhu

Former Member
0 Kudos

Hello,

Procurement Type = F

Special Procurement  is a specific code  with this parameter in the cusotmising :

             * Special procurement  = U  (STock tranfert)

             * Plant  : ZXXXX

             * The others parameters are empty (As BOM component paraméters)