Hi folks,
I have an situation to Schedule a job in SAP CPS 8.0 for ECC "Every 15 minutes and during 01:00 - 2:30 every 5 minute".
How do we do this and any inputs/suggestions are highly appreciated.
Thanks,
Shiva
Create two time windows;
Create two submit frames
Schedule the same job twice:
thanks
Nanda
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thank you for the quick response Nanda and I really appreciate your suggestions.
Is something can we do as below? The reason is, I want to minimize the # of job count as I have to crate 2000+ jobs.
Create two time windows:
A - Open between 01:00 to 02:30
B - Maintained "Disabled During Time Window" column with "A"
FYI - I think, this is what your intention is (B - Open when A is closed), correct me if this is not the case.
Create one submit frame (C) with 2 elements:
Elements 1: Interval:
Submit every 5 minutes
During Time Window "A"
Elements 2: Interval:
Submit every 15 minutes
During Time Window "B"
Schedule the job with submit frame "C"
Thanks,
Shiva