Edm.DateTime issue with Integration Gateway

rakshit_doshi
Active Contributor
0 Kudos

Hi,

We observed a strange behaviour that when the application connection id is routed through the backend connection hosted on to the integration gateway on SMP, the Edm.DateTime field show a day prior to the one in the SAP System whereas if we change the backend connection directly to the Netweaver Gateway System, it shows fine. For e.g if a date is of 24th August, the application running with the backend conenction of Netweaver Gateway shows the proper date of 24th August but the one having the integration service background shows the date on 23rd August.

Is this a limitation of SMP Integration Gateway.

We are running on SMP 3.0 SP7.

Appreciate your response if anyone has faced or is are aware of this issue.

Thanks,

Rakshit Doshi

Accepted Solutions (1)

Accepted Solutions (1)

rakshit_doshi
Active Contributor
0 Kudos

We solved this issue. It was the time zone issue. Integration Gateway uses the system time and not the timezone. Changed the time zone to UTC Coordinated Universal Time on the SMP Server and it worked fine.

Answers (2)

Answers (2)

bjoernw
Participant
0 Kudos

Hi Rakshit,

this sounds like a product issue. Could you please raise an incident so that we can investigate this?

Thanks and regards

Björn

Jitendra_Kansal
Product and Topic Expert
Product and Topic Expert
0 Kudos

Lets call