Work order - Actual start/end dates

0 Kudos

Hi experts,

I wonder if it is possible to modify the way to obtain the actual start/end dates when the work order is confirmed.

I want thtat the system doesn't take into account the external operatioins to calculate these dates.

Is it possible?

Thanks in advance.

Accepted Solutions (0)

Answers (1)

Answers (1)

jogeswararao_kavala
Active Contributor
0 Kudos

You can bulid your logic for dates and default the same into the confirmation screen while carrying out confirmations through IW41 or IW44, by using user-exit CONFPM01.