on 09-02-2015 7:24 AM
Hi Experts,
Has anyone worked on variant configuration in SAP PM. Pls share what are the business scenario are available, & how we can do the same in SAP .
Regards,
Peter
Peter,
There are a few areas where I have used VC in the PM/CS modules, here's some examples:
There are probably other areas where you can use the variant class 300 on other PM objects too, but I have never used them.
PeteA
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hell Peter,
Configurable Tasklist:
Suppose a Motor repair facility is there, where motors of various types like illustrated in the document are repaired. Then a large common tasklist using variant class 300 can be used to cater all motors. When we enter the parameters of the motor (like kw, rpm, type etc) the relevant operations are copied to the Order.
Configurable Material:
Suppose a Steel Mill is there for manufacturing plates. With the help of Configurable material One Material code will be able cater different material variant requirements for selling by just altering the characteristic values attached its variant class. For example for the case of manufacturing a steel plate with same thickness and width but different lengths at times can be managed through this concept by just changing the value in Length characteristic of the Material.
Also go through this:Material Variants - Variant Configuration
Similar concepts for other variants also.
Working with Configurable BOMs
Regards
KJogeswaraRao
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.