Hello everybody,
I'm running a package link in the EPM. How is it possible to run through all the steps of the package link even if one of them failed ?
Thank you very much for the help
Emmanuel
Hi Emmanuel
You can create a custom process chain and call each package using UJD_PACKAGES2 with a variant. When linking one step to next, you can control if the next step should proceed when previous one is successful or always. Call this process chain using a Data Manager Package.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
What type of packages do you have in the package link?
Please provide detailed info.
Vadim
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Emmanuel,
I think It's not possible to run next package if previous package get failed.
You can schedule the DMP or create multiple links with one step and schedule it.
Shrikant
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
6 | |
5 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.