Hi Experts,
I found all the planned order dates in MD04 are the first work day.
How can I make them to another date, for example 15th or the middle of the month.
thx guys for your reply
but still this is not the point,
the issue into 2 words is I dont want to enter the month with all requirements produced I want to produce the half of quantity during the month of the requirement
I heard about distribution key (GLEI key ) can any one explain how to use for my issue ?
thanks in advance
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Caetano ;
I am sorry for bothering you but if you go up you will find that I am asking my question well using an example also ! and I also spend time in search that I found a solution with " distribution key " which I mentioned above .
You answer me a few minutes ago that there is no solution , so I replied you thinking that you read my above comments that I actually found the solution with this distribution key but still I don't know how to deal with it (distribution Key and Strategy )and for that I ask for help.any way thank you for you time and I am sorry for bothering you.
concerning my old threads I don't know that I must close it until you told me now , so I will do.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Amal
I'm not the one who can decide which thread should be closed. I can only see that you have already opened 32 threads and that most of them have at least one answer (most of them more than one). However, only two threads were closed.
I suggest you to review your old threads and check for which them the issue has been resolved. In this case, you should close the thread. Please follow the instructions from the blog .
This thread is an example. If you found the solution with the distribution key, you can close the thread, so that another users (like me) stop answering.
BR
Caetano
if u can help with explained document if u have , i will be very thankfull
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Moreover, I was checking your old threads and most of them were answered, however, they are still open.
When you get a solution for your issue, you should close your threads. If you keep your threads open, without giving any kind of feedback or selecting the correct and helpful answers, SNC users will not be willing to answer your threads anymore.
Therefore, please be a responsible SCN user and close your old threads for which you got an answer.
The blow provides more details.
BR
Caetano
Dear Caetano ;
actually I read a way to split the PIR using the distribution key , but I still search how to use it!
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
any help plz
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello
It is a basic demand management pre-requisite that the planned independent requirements are placed on the first working day of the period. If you are using the period month to create PIRs, they will always be created on the first working day of the month. Changing that may lead to side-effects on the PIR consumption or duplication of quantities. You can find more information on note 339043.
If you want to place your PIR on a different date, then you must use a different period, such as week.
BR
Caetano
I found this definition in my search :
Distribution function gives you the percentage of the quantity to be produced after a percentage of the production time has elapsed.
So I think is what I need but I dont know how to define the distribution Key and Strategy to fit my requirement .
plz help
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
weekly lot size divide my planned orders but still i will enter the week with all qty .
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Kamal,
Sorry I did not read your example completely please ignore my earlier reply.
You can achieve your requirement with Overlapping in OMI4 configuration and Takt time.
Please read SAP help document for further guidance Lot Sizes with Splitting and Overlapping - Material Requirements Planning (PP-MRP) - SAP Library
BR
KK
I use Monthly lot size but this is not my issue, let me explain with example
i enter my plan on monthly basis say
10/2015 11/2015 12/2015
1000 500 2000
so when i run my MRP a pl o will be created with this dates
1.10.2015 Pl.O with 1000
1.11.2015 Pl.O with 500
1.12.2015 PL.O with 2000
this mean i will enter each month with the total qty needed for this month my issue is how to make planned order split to enter the month with the half of the qty and have other pl in the middle of the month , I mean
1.10.2015 PL.O with 500
15.10.2015 PL.O with 500
1.11.2015 PL.O with 250
15.11.2015 PL.O with 250
1.12.2015 PL.O with 1000
15.12.2015 PL.O with 1000
I hope i clearly explain my case
plz any help ?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Please create a new lot size with overlapping as per your requirement (i assume overlap in future should do) and Split Quota set.
In material master, please maintain the Takt time. I your case it has to be 12 days, assuming 6 day working calender. Maintain the maxiumum lot size.
Your issue will be resolved. Let us know if u face any issue.
Hello,
What is the lot sizing procedure that you use ?
You can explore periodic lot sizing procedures with a planning calendar in MRP 2 view to meet your requirement.
Best Regards,
Ameya B.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.