cancel
Showing results for 
Search instead for 
Did you mean: 

Prepack article movement at DC

Former Member
0 Kudos

Hi Guys,

My client is using prepack concept to manage their stock at Retail Industry.

Current :

We are creating PO at DC at prepack level, the component is exploded automatically

but when we do the goods receipt for PO, the proposed line item at GR is at component level.

Our requirement is to do the GR at DC and prepack level to ease the GR process,

and we want to review the stock at Prepack and Component level.

Question :

1. What is the best practice at retail to manage the prepack material distribution?

2. Is it standard to do GR and GI at DC at prepack level?

3. Is there any standard report to view material at prepack and also at component level?

Thanks in advance

Regards

Ste

Message was edited by: John Mattam

Accepted Solutions (0)

Answers (1)

Answers (1)

eduardo_hinojosa
Active Contributor
0 Kudos

Hi Stefanus

Check the document "Handling of Structured Articles in ECC 6.0 at the time of PO,GR and SO" in this site by Aram Kalyanasundaram. In one of the steps in customizing, you can change the explosion to GR instead PO.

Go to this link and download the PDF file. http://scn.sap.com/docs/DOC-29560

I hope this helps you

Regards

Eduardo