Hi Experts,
I am facing one strange issue on which Material Ledger view (T-Code: CKMACD) is showing different planned price and Cost Object Controlling view (T-Code: KSBT) is showing different planned price of Activity Types in the same period.
I checked everything but got no luck, kindly refer below screen shots and help me if you faced the same issue ever
CKMACD
KSBT
Regards,
Zain Bashir
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi...
If you use the functions of the Product Cost by Period component with product cost collectors,
System can posts activities to the product cost collector using preliminary costing for the product cost collector or standard cost estimate per material when back flushing.
In this case, If you calculate preliminary cost or standard cost using year average activity price, the difference between CKMACD and KSBT is average activity price and period activity price.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Zain
What type of material it is? Raw/SFM/FG ? if SFG or FG can you see the order level cost of activity..before revaluation and after revaluation...
Kamal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
7 | |
6 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.