Hi gurus,
Im using the Price date category in PO for taking a new price at GR. It works perfect for Materials. But for Services is not working. I ve created a PO with reference to Service Contract and when I select in the PO the service from the Contract, automatically SAP put Manually (4) the price date category field. And I need to be set in 5 (GR). And I can´t chang it manually.
Please give me some light on this, couse I v been searching a lot in forums but I can´t find a solution for this!!
Thanks and regards,
Daniel
Hi,
For Materials PO working perfectly but in case of Service PO not working?
Check to find the difference in properties(M/06) in between condition type for Material PO(PB00) and Service PO(PBXX)
Regards,
Biju K
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Check Material Group you used in your PO(service order) and can try having pricing date category in info record(purchase organization data)with that Material Group or try having pricing date category in vendor master(purchasing data).
If not fulfilled - you need cross check, did PBXX condition type manual in nature cause your concern!
Regards,
Biju K
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
AKPT, this customizing was already done. I can see the Price date cat. The problem is:
when I create the PO ref to a Contract the Price date cat is in 5 GR Date (this is what I need)
But then, when I go to select the services from the Contract:
Now that I got the service line, the Price date category turns automatically in 4 - Manual.
And I need the Price date category to be 5 GR date for services line.
I hope now understand the issue.
Thks & regards
Daniel
I read the message 06 634 and it said: Pricing cannot be carried out for the item at the time of goods receipt because the price was either entered manually or copied from the last purchasing document.
But I don´t touch the price, it cames from the Service Contract as reference. When I do the same with Materials I don´t have this problem it brings the price and price date categ is still setting as 5 - GR date.
Regadrs, Daniel
Hi,
Please check the condition tab in the PO - item level and check the condition type - in service PO, the condition type will be PBXX (manual condition without any access sequence), which makes the price determination not possible at the time of GR. Refer the notes:444708 - New price determination for GR, no posting of freight costs and 1888645 - ME21N New pricing at GR for manual gross price PBXXwhich explains the system design.
Regards,
AKPT
Hi,
Check the AAC you used - along with the Item Category - for Goods Receipt Indicator. If GR indicator is unset, meaning there is NO GR for Service PO. Subsequently you can not determine Price Date Category - GR date - since there is no GR at all.
Please check and revert
Thanks
NR
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
101 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.